halfnine
halfnine is developing controllers and software for sites that run on pumps, tanks and sensors, starting with fish farms, hatcheries and small water and wastewater systems. It’s built on the Raspberry Pi Compute Module 5.
The hardware isn’t released yet. Until it is, these guides cover what we’ve learned building monitoring and control systems: choosing a controller, wiring Modbus, designing alarms that reach a person, and the standards a controller has to meet.
Brand and entity
- What is halfninehalfnine is developing Raspberry Pi CM5 controllers and a software suite for monitoring, control and alarms at small sites.
- StatusWhere halfnine stands now and what comes next, updated as each part is built.
- Early accessGet notified when halfnine's controllers and software are ready to try.
Comparisons and alternatives
- Revolution Pi alternativesControllers people compare with the Revolution Pi Connect, what each does better or worse, and prices and specs from vendor pages as of November 2026.
- Best industrial Raspberry Pi controllers, 2026Industrial Raspberry Pi controllers grouped by the job they suit best, with sourced prices, temperatures and certifications as of November 2026.
- CM5 industrial controller comparison tablePrice, I/O, temperature, certifications and software for DIN-rail controllers built on the Raspberry Pi CM5, with a source for every cell.
Selection guides
- How to choose an industrial Raspberry Pi controllerEight questions to answer before you buy a Raspberry Pi-based industrial controller, from I/O and temperature to UL listing, lifecycle and software.
- Raspberry Pi vs PLCA bare Raspberry Pi is not a PLC, but an industrial Pi controller can do many PLC jobs. Where each fits, what differs, and when to use both.
- CM5 vs CM4 for industrial useFor new industrial designs the CM5 is usually the better choice, with a faster CPU, USB 3.0 and supply to 2036. The CM4 still wins on cost and cold rating.
- Is a Raspberry Pi reliable enough for industry?A hobby Raspberry Pi on a microSD card is not. A Compute Module in an industrial controller, with eMMC, protected power and a watchdog, can be.
Standards and compliance
- UL 61010-2-201 for programmable controllersUL 61010-2-201 is the North American safety standard for PLCs and other control equipment, used together with UL 61010-1. It replaced UL 508 for PLCs.
- The UL 508 to UL 61010-2-201 transitionSince 2026-10-28, programmable controllers can no longer be certified to UL 508; they need UL 61010-2-201. Other UL 508 products moved to its 19th edition.
- UL 508A panels and the controllers inside themAn unlisted Pi-based controller fits a UL 508A panel only on narrow terms: Class 2-only wiring, a UL evaluation, or a field evaluation.
Protocols and integration
- Build a Modbus RTU to MQTT and Modbus TCP gateway on a Raspberry PiA tested Python gateway that polls Modbus RTU devices over RS-485, publishes each reading to MQTT and serves it read-only over Modbus TCP, run by systemd.
- Modbus RTU over RS-485 on a Raspberry Pi 5 or CM5Enable a UART on a Pi 5 or CM5, pick a 3.3 V RS-485 transceiver, terminate and bias the bus, read a register, and fix the usual faults.
Alarms and remote monitoring
- Alarm escalation by SMS and voice callAn escalation chain calls people in turn until one acknowledges, using SMS and voice from more than one provider so no single failure silences it.
- From a Modbus or MQTT value to an SMS alarm, end to endA tested Python alarm service with setpoints, deadband, delay, latching, SMS through Twilio, acknowledgement over HTTP and a JSON event log.
- Power-failure alarms that still work when power is outA power-failure alarm needs its own battery, a way to sense mains loss, a communication path that survives the outage, and a cloud check for silence.
- Dial-out alarm boxes vs cloud alarmsA dial-out box calls from site with no subscription. A cloud alarm adds escalation, history and silence detection, but depends on a hosted service.
Vertical, aquaculture
- Dissolved oxygen alarmsMost farmed fish are stressed at 2 to 4 mg/L dissolved oxygen. Set a warning above that, an action level below it, and make low DO open backup oxygen.
- Preventing a 3 a.m. fish kill in a recirculating systemIn a dense RAS, a pump or power failure can drop oxygen to stressful levels in minutes. Layer alarms, automatic backup oxygen and a tested call-out.